Key takeaways

  • Read the alteration agreement before choosing a floor; it sets the approvals, the sound requirement and the working hours.
  • Open a small area of the old floor first. Sleepers in cinder fill and a bare concrete slab call for different floors.
  • The rug rule and an acoustic underlayment requirement are separate; many buildings ask for both.
  • Add up the finished height and check it at the front door, the radiators and the kitchen before ordering.
  • Measure the service elevator before ordering long planks.

A wood floor in a Manhattan co-op or condominium can almost always be replaced, but the building decides how. Four things should be settled before any wood is ordered: what the alteration agreement requires, what is under the floor you have, how the sound requirement will be met, and how thick the new floor can be.

This article follows the order in which those questions come up. If you would like to go through your own building’s documents with us, you can book a consultation.

1. Start with the alteration agreement

The alteration agreement is the contract between you and the building for any renovation. Ask the managing agent for the current version before you look at samples. For a floor, it normally covers:

  • What has to be submitted. A written scope, and often drawings and product data for the flooring and anything going under it.
  • Who reviews it. Many buildings send the submission to their own architect or engineer, at the owner’s cost.
  • Insurance. Certificates from every contractor, naming the building and the managing agent.
  • Working hours. Weekday hours are usual, with shorter windows for noisy work. Some buildings allow major work only in the summer months.
  • Time limits and deposits. A completion date, a security deposit, and sometimes a daily charge if work overruns.
  • Protection. Coverings for hallways and the service elevator, and rules for removing debris.

A specification written before this document has been read usually has to be written again.

2. Find out what is under the old floor

The age of the building is the best first clue.

Building What is usually under the wood What it means
Pre-war co-op or apartment house Solid oak nailed to a wood subfloor or directly to wood sleepers, set in cinder fill above the structural slab A new floor can be nailed down; the sleepers and fill need checking once the old boards are up
Post-war building or new tower A concrete slab, sometimes with a thin levelling layer The new floor is glued down, usually over an acoustic underlayment
Loft or townhouse Timber joists with a board or plywood subfloor The floor is nailed; level and stiffness are the first concerns

Buildings were altered over the decades, so the table is a starting point, not a guarantee. Lifting a floor register, a threshold or a few boards in a closet shows what is really there, and it is far cheaper to learn that before demolition than during it.

In a pre-war apartment, look for three things once boards are up: sleepers that have come loose from the fill, fill that has settled and left the floor hollow, and old damage around radiators and steam risers.

Unfinished prime-grade European oak laid in a herringbone pattern
New oak herringbone before finishing. In a pre-war apartment it can be milled to the block size of the original floor.

3. Meet the sound requirement

Two different rules deal with noise, and they are often confused.

The rug rule. Most proprietary leases and house rules require rugs or carpet with padding over about 80 percent of the floor outside kitchens and bathrooms. It governs how you furnish the apartment after the work is finished.

The assembly requirement. Many alteration agreements now also require an acoustic underlayment beneath any new hard floor, with a laboratory test report. The New York City Building Code sets a minimum Impact Insulation Class of 50 between dwelling units in new construction, or 45 when measured in the finished building, and boards often take that as their reference or ask for more.

Three points help when comparing underlayments:

  1. A rating belongs to the whole tested floor and ceiling, not to the product alone. Check that the test was run on a structure like yours.
  2. Delta IIC shows how much the underlayment adds to a bare slab, which makes products easier to compare.
  3. The new floor must not touch the walls. A perimeter gap, covered by baseboard that sits just clear of the wood, keeps sound from travelling around the underlayment.

Over sleepers or joists, the acoustic layer usually goes between the structure and a new plywood subfloor. Over concrete it is glued to the slab and the wood is glued to it.

Doussie chevron floor with a darker inlaid band running towards a wall of glazed partitions
Chevron on the 38th floor of a Midtown tower. In a tower, wood is glued to the concrete slab, and the layer beneath it carries the sound rating.

4. Check the slab or subfloor

Concrete slabs are tested for moisture before a glue-down floor is laid. In-situ relative humidity testing to ASTM F2170 uses probes set in holes drilled into the slab, so confirm with the building’s engineer that drilling is allowed. The pass mark comes from the adhesive and flooring manufacturers. Glue-down plank also needs a slab that is flat to within 3/16 inch over 10 feet, or 1/8 inch over 6 feet, and most slabs need some levelling to get there.

Wood subfloors are checked for moisture content with a meter, and for movement by walking them. Anything that squeaks or deflects before the new floor goes down will do so afterwards.

5. Add up the height

A new assembly is rarely the same thickness as the floor it replaces, and an apartment has many fixed points. Add up the underlayment, any plywood, the adhesive and the wood, then check the total against:

  • The front door and its saddle. Apartment entrance doors are fire-rated and cannot simply be trimmed.
  • Radiators, convector covers and the steam risers that pass through the floor.
  • Kitchen cabinets and appliances, especially a dishwasher under a counter.
  • Bathrooms and other rooms that keep their stone or tile.
  • Any original doors, casings and baseboards you intend to keep.

A small difference at a threshold can be shaped into a transition. A large one needs a decision about the assembly before anything is ordered.

Dark wide-plank oak floor beneath walnut cabinetry in a kitchen and dining room
Wide-plank oak under fitted cabinetry. The floor height has to be fixed before a kitchen like this is drawn.

6. Plan delivery and working days

  • Measure the service elevator. The inside height and the diagonal of the cab limit the plank length that can go up. Find this out before choosing long lengths.
  • Book the elevator for demolition, delivery and removal, as the building requires.
  • Deliver into a conditioned apartment. Heating or cooling should be running normally, with indoor conditions between 60 and 80°F and 30 to 50 percent relative humidity.
  • Choose the finish with the building in mind. A factory-finished floor shortens the time on site and avoids finish odours in the hallway. A site-finished floor needs more working days and the building’s agreement on products.

Summary checklist

Item What to confirm
Alteration agreement Current version obtained; submission approved in writing
Existing floor Opened in one place; structure beneath identified
Sound Building’s requirement known; test report matches the structure
Slab or subfloor Moisture tested; flat to 3/16 in over 10 ft for glue-down
Height Total assembly checked at the front door, radiators and kitchen
Delivery Service elevator measured and booked
Site conditions 60 to 80°F and 30 to 50% relative humidity

Once the floor is down, the winter heating season is its first real test. Our guide to steam heat, dry winters and wood floors in Manhattan apartments covers how to keep the joints tight. To go through a specific building and floor together, book a consultation.

The figures here are general industry and building-code guidance. The written requirements of the flooring, adhesive and underlayment manufacturers, and the alteration rules of the building, always govern a specific project.

Questions

Quick answers

Do I need a permit to replace wood floors in a Manhattan apartment?

Replacing a floor finish by itself does not usually need a Department of Buildings permit, but the building's approval is a separate matter and is almost always required. If the work also touches structure, plumbing, gas or fire-stopping, ask your architect or contractor what must be filed before you start.

What is the 80 percent carpet rule in New York apartments?

It is a house rule, found in most co-op proprietary leases and many condominium rules, that requires rugs or carpet with padding over about 80 percent of the floor in rooms other than kitchens and bathrooms. It applies to how the apartment is furnished, and it is separate from any underlayment the building requires under a new floor.

Can I glue engineered wood directly over the old floor in a pre-war apartment?

Sometimes, but only if the old floor is sound, flat and firmly fastened, and the building allows it. Loose or cupped boards will show through the new floor, and the added thickness can cause problems at doors and radiators. In most cases it is better to remove the old boards and build up from the subfloor.

Selected projects

Floors from our projects

View all projects
Doussie plank floor in a corner room with a round table and two windows onto Midtown towers
Doussie plank in a corner room over the city
Doussie chevron floor with a darker inlaid band running towards a wall of glazed partitions
Chevron running to glazed partitions
Doussie chevron parquet floor with a straight-laid border meeting a wall of glazed doors
Doussie chevron with a straight border

Consultation

Begin with the building.

Tell us its age, what the alteration agreement says, and the floor you would like. We will tell you how to get there.